Translation: Saint Expeditious / Thanks for the favors granted! From the Mapuche Indian campaign against the Ralco and Pangue dams on the Rio Bio Bio. Saint Expeditious is former Chilean President, Richard Lagos. The logos are mostly foreign owned, multinational energy, timber and mining corporations upon which the economy of Chile is dependent.
INTRODUCTION
When completed, the HydroAysen Project is expected to generate 2,355 megawatts of electricity, with a 2000 kilometer-long transmission line strung, north-to-south, across the heart of Patagonia, Chile. The devastation it will wreak across the entire region will be enormous. Presently, Patagonia, Chile is one of the last, truly unexploited wilderness regions in the world. With the rising price of fossil fuels, the looming crisis of global warming, and Chilean dependence on foreign energy, the Chilean government insists it needs the HydroAysen Project as a vital, clean renewable source of energy for the future of the country. Does this supposition hold-up?
DATA
To better understand the HydroAysen Project it will be beneficial to examine how the HydroAysen Project (at 2355 megawatts) compares to other energy producing ventures around the world.
Hydroelectric Projects Worldwide(1):
Three Gorges Dam, China - 18,200 megawatts
Itaipu, Brazil/Paraguay - 12,600 megawatts
Guri, Venezuela - 10,000 megawatts
Grand Coulee, USA - 6,494 megawatts
Sayano-Shushensk, Russia - 6,400 megawatts
Krasnoyarsk, Russia - 6,000 megawatts
Churchill Falls, Canada - 5,428 megawatts
La Grande, Canada - 5,328 megawatts
For all its hype about "saving Chile from foreign energy dependence", at completion, the HydroAysen Project, generating at 2,355 megawatts, will not even rank in the top ten energy producing hydroelectric power projects in the world. This begs the next question, how does HydroAysen stack-up against other energy producing schemes?
Some examples:
Nuclear:
Palo Verde Nuclear Generating Station, USA - 3,810 megawatts (2)
Coal:
Keystone Generating Station, USA - 1711 megawatts (3)
Wind:
Horse Hollow Wind Energy Center, USA – 735 megawatts (4)
Geothermal:
Sarulla Geothermal Power Project, Indonesia – 340 megawatts (5)
Solar:
Victoria Solar Power Station, Australia – 154 megawatts (6)
Wave:
Pelamis Wave Power Farm, Scotland – 3.0 megawatts (7)
Tidal:
Marine Current Tidal Project, Ireland – 1.2 megawatts (8)
DISCUSSION
Drawing from the data above, the HydroAysen Project, as planned, with five dams on the Rio Pascua & Rio Baker, will deliver as much electricity to Chile as one-and-a-half coal-fired power plants, two-thirds of a nuclear power plant or three large wind farms.
The HydroAysen Project “concept” is approximately the same as proposing to build one-and-a-half coal-fired power plants in the remotest region of Patagonia, Chile and then constructing a 2000 kilometer-long transmission line through one of the world’s last pristine wilderness areas.
Had the plan called for a coal-fired power plant to be built in the same region it would have been declared environmentally and economically absurd.
When considered alone, the HydroAysen Project is not coherent. Endesa S.A. and Colbun S.A. could find less expensive and less environmentally damaging energy projects in Chile to develop, a nation with a total nominal population of just over 16 million.
So what are the forces driving this project?
Carbon Credits: Hydroelectric projects in Chile benefit from the funding provided by the Cap-and-Trade Carbon Credit Scheme implemented in Europe as a part of the Kyoto Treaty. This scheme allows polluters in Europe to pay nominal fines for exceeding their allotted “carbon cap” instead of implementing more costly fixes which would actually go toward reducing worldwide greenhouse gas emissions. (9,10,11) The monies collected for excess emissions are then funneled to companies like Endesa S.A. to build hydroelectric plants in places like far-off Patagonia. Carbon Credits provide the insurance utilities need to undertake economically risky projects like HydroAysen. (12,13)
While the Cap-and-Trade scheme might seem plausible at first pass it does not bear close scrutiny. (14,10) For example, if Enel Sp.A, the parent company of Endesa S.A., were to exceed its carbon cap ceiling for its fossil fuel power plants in Europe(15,16) it could purchase carbon credits on the open market to offset its emissions. The purchaser and beneficiary of these funds could then be Endesa S.A. which has a carbon offsetting hydroelectric project going on in Patagonia, Chile or elsewhere. (17) A situation has now developed where companies avoid cleaning up their carbon emissions and instead funnel monies to their subsidiary operations in the developing world. (18,17)
Natural Resources: Patagonia, Chile is a roadless untracked wilderness with exceedingly forbidding terrain; Charles Darwin dubbed it “The Green Desert” when he visited in the early 1800s. Currently, Patagonia has very little infrastructure to support its own small communities, never mind mining, timber and other extractive industries. With the coming of hydroelectricity and the ensuing roads required to build the dams and transmission lines, the extraction industries will have unprecedented access to this pristine and unexplored region of the world. (19)
The Unholy Alliance – Mining & Hydroelectricity: As of October 2007, approximately 59% of Chile’s electricity comes from hydroelectric sources. (20) Of all the power generated in Chile 37% is consumed by the mining sector with just 17% going to residential and domestic consumption. (21) Contrary to the reports the average Chilean regularly reads about in the media, Chile does not have an “Energy Problem” it has a” Mining Problem”. (22) In the first three quarters of 2007 (Jan-Sept) the mining industry accounted for 50% of all the corporate profits that were earned in Chile. (23) The vast majority of these profits went to foreign international mining conglomerates, which own 70% of Chile’s copper production (24), like BPH Billiton (Australia) and Barrick Gold Corporation (Canada). Additionally, a majority percentage of Chile’s electricity utilities are foreign owned as well. The cry by Chile's Government for “foreign energy dependence”, is a straw-man, fed to an undiscerning public by the foreign owned extraction and energy industries upon which Chile "is dependent".
CONCLUSION
A situation has now developed that puts Patagonia, Chile clearly in the crosshairs of the hydroelectric and extraction industries. (25) With the advent of hydroelectricity in this remote region of the world, the mining and timber companies will be ensured the electricity they require to power their operations. This in turn will provide the profit incentive for Endesa S.A. and other concerns to construct more dams. (26) The end result will be a despoiled and poisoned landscape that the exploited regions of Northern Chile and Peru are fast becoming.
Sources:
1] International Hydropower Association, UK
2] Palo Verde Nuclear Generating Station, USA
3] Keystone Generating Station, USA
4] Horse Hollow Wind Energy Center, USA
5] Sarulla Geothermal Power Project, Indonesia
6] Victoria Solar Power Station, Australia
7] Pelamis Wave Power Farm, Scotland
8] Marine Current Tidal Project, Ireland
9] Profiteering from Carbon Trading
10] "The Kyoto Protocol has proved totally ineffective on the practical side", says Italy's Enel / Endesa CEO
11] Bali's business bonanza.
12] Australia's Pacific Hydro finds a loophole: Climate change, Kyoto, and carbon trading
13] Kyoto deal to clear air for Australian investors, say experts - Pacific Hydro's manager says, Australia is "now open for business".
14] Time to ditch Kyoto - Mitigating European Pollution with Patagonia Dams
15] Lighting Up Europe - Are Enel, E.ON & Endesa serious about fighting global warming?
16] Green Power Pioneer, ENDESA granted permission to build two 430 MW Gas Turbine Plants in France
17] Enel, owner of Endesa, completes acquisition of 3 Conduit hydro plants in Mexico - all three yield European carbon reduction credits.
18] Endesa SA to build two coal and gas fired power plants in Chile - Is Endesa's Climate Initiative full of Hot Air?
19] Chile's 21st Century Gold Rush
20] Chile: Environmentalists Demand Changes as Crisis Looms
21] Environmental impacts of the Endesa El Porton Dam in the Puelo River Basin
22] "Chile is the best mining jurisdiction in the world... Canada is not a jurisdiction where I would like to develop a mine." says Centenario Copper CEO
23] Mining Giants Account For Fifty Percent Of All Corporate Profits in Chile
24] Ransacking Chile - Fabulous profits for the multi-nationals
25] The Looting of Patagonia Has Begun, Say Chile Dam Opponents
26] Xstrata & Transelec Negotiate Cuervo River Dam Project
Sunday, November 11, 2007
The HydroAysen Project - Damming the Pascua & Baker Rivers in Patagonia, Chile – Perspective, Background, Facts & Motivation
Posted by
Patagonia Under Siege Editor 1
at
6:47 PM
Labels: Aysen Project, Baker, Carbon Credits, Colbun, Cuervo River, Endesa, Enel, Global Warming, Greenwash, HidroAysen, Mining, Pascua
Thursday, October 18, 2007
Proposed Dams Near Seismic Fault
Residents and activists already concerned about the devastating impact proposed dam projects could have on southern Chile’s pristine wilderness, now have a new argument for why it is simply a bad idea to dam Patagonia’s rivers: earthquakes.
In recent weeks, the towns of Pueto Aysén and Puerto Chacabuco in southern Chile’s Region XI have been jolted by an unusual spate of seismic activity that continues to rock the area. In the last week of January alone, seismologists recorded an astounding 1,700 tremors—only a small but still alarming number of which were noticeable. A few of the small quakes registered as high as 6 on the Mercalli scale. Locals initially feared a repeat of the devastating 1991 eruption of the nearby Hudson Volcano, which was preceded by a similar cluster of tremors and quakes.
Authorities, however, have since come up with another theory to explain the tremors. A team of scientists dispatched to the area in late January concluded that the quakes are likely being caused by underground magma flow in the nearby Aysén fjord. According to the experts, the magma, which is pressuring a subterranean tectonic plate, could eventually push its way to the surface and form a relatively small volcanic cone on the seafloor of the fjord.
The scientific team—made up of a Universidad de Chile seismologist, a geologist from the National Mining and Geologic Service and a volcanologist from the National Emergency Office—identified the epicenter of the tremors as being approximately 12 miles northwest of Puerto Chacabuco.
Xstrata’s project map superimposed on map of region with the epicenter of the quake at left. (Courtesy: http://www.eldivisadero.cl)
That, say some area residents, is dangerously close to the site of a 600-megawatt hydroelectric dam the Swiss mining company Xstrata—working through its local affiliate Energía Austral—plans to build on the Cuervo River. Xstrata, which has already submitted the requisite Environmental Impact Study, is looking to begin construction on the $600 million project sometime next year.
During a community forum organized earlier this month by journalist Patricio Segura and architect Peter Hartmann, participants expressed major concern about the Xstrata project’s proximity to the estimated epicenter of the quakes.
“It seems dangerous to me,” said Paola Bustamante, a teacher from Puerto Aysén. “It’s terrifying to me to think about earthquakes plus dams. With the appearance of this new variable, I think we need to take an even deeper look (at this proposal) and tell people the truth, not hide anything.”
“The people are really worried about the issue of quakes,” said Hartmann, who also heads the regional office of an environmental group called the Committee for the Defense of Flora and Fauna (CODEFF). “The problem is that the epicenter of the recent quakes and the volcano that might form there are exactly in front of the place where they want to build the dam. This represents a risk even for the company.”
Here is the full article.
Posted by
Patagonia Under Siege Editor 1
at
5:34 PM
Labels: Cuervo River, Dams, Mining, Xstrata
Xstrata, Company behind Patagonia Dam Project Criticized in Australia
Xstrata, criticized heavily by a growing number of Chileans opposing the Swiss mining company’s plan to build a large hydroelectric dam in northern Patagonia (Region XI), is no stranger to controversy – especially when it comes to rivers.
In recent months the mining company has struggled to gain Chilean government approval for its plan to dam the Cuervo River. Hoping to begin construction on the proposed 600 MW dam sometime next year, Xstrata submitted a requisite Environmental Impact Study (EIS) this past January (ST, Jan. 5). The EIS did not impress Chile’s National Environmental Committee (CONAMA), which refused to even consider the “insufficient” report (ST, March 22-23). CONAMA did, however, invite the company to submit a second EIS, something Xstrata promises to do.
Local activists and environmentalists, meanwhile, want nothing less than to send the Swiss mining company packing. Not only would Xstrata’s proposed dam be environmentally hazardous to the pristine wilderness area, but – given a barrage of seismic activity that’s affected the zone in recent months – it would also be just plain dangerous, say opponents.
“To do that, to build (the dam) right now would be a time bomb,” Hipolito Medina of the environmental group Ecosistemas recently told the Patagonia Times. “You don’t need to be an engineer, a geologist, a sorcerer or anything to realize that (the Xstrata plan) is a real danger.”
Criticisms against the company, however, are by no means limited to southern Chile. In fact, on the opposite side of the planet – in Australia’s Northern Territory (NT) – Xstrata currently finds itself at the center of a separate controversy.
Here is the full article.
Posted by
Patagonia Under Siege Editor 1
at
5:25 PM
Labels: Cuervo River, Mining, Xstrata
Xstrata & Transelec Negotiate Cuervo River Dam Project
Xstrata, a Swiss mining company planning to build a hydroelectric dam in Chile’s far southern Region XI, has entered into negotiations with Canadian-owned electricity transport company Transelec, the Chilean business daily Estrategia reported this week.
The Swiss company, a substantial player in Chile’s mining industry, hopes to build a 600-MW dam on Region XI’s Cuervo River. The project has not yet been approved by Chile’s National Environmental Commission (CONAMA), which rejected an Environmental Impact Study Xstrata submitted earlier this year (ST, March 22).
Xstrata is by no means the only multinational interested in the energy potential of Patagonia’s powerful, glacier-fed rivers. Spanish electricity giant Endesa, working in collaboration with Chilean energy company Colbún, also has big plans for the area. With their so-called Aysén Project, the Endesa and Colbún plan to build five dams that would together generate some 2,750 MW.
The question for all three companies is how to transport that energy from Region XI (Aysén) to energy hungry central and northern Chile. For Endesa and Colbún, the answer is a US$1.5 billion, 2,000-km. transmission line, to be built by Transelec. Up to now, however, it’s been reported that the carrying capacity of such a power line would be limited to roughly the amount of electricity Endesa and Colbún plan to generate. The transmission line, in other words, would not be able to accommodate Xstrata or any other company with plans to dam Patagonia’s rivers.
An article published Tuesday in Estrategia, however, suggests otherwise. Reporting that Xstrata and Transelec have begun preliminary negotiations, the article went on to suggest that by employing a so-called quadripolar system, the Canadian company could theoretically accommodate Xstrata’s 600-MW contribution. If that is indeed the case, Xstrata could avoid having to build a second, parallel transmission line.
Here is the full article.