“The mentality in this country is the following,” he said. “If people see money, if they see power, they will immediately sell everything.”
After Nine-Day Trek, Protestors Demand Response From Regional Authority
(Nov. 28, 2007) Over 100 horseback riders descended on the XI Region capital Coyhaique at noon Tuesday, concluding a nine-day tour of the Region to protest the HydroAysén dam project. The Cabalgata Patagonia Sin Represas (Cavalcade for a Patagonia without Dams) departed last Monday from the town of Cochrane, the site of the proposed hydro-electric project, some 330 kilometers away.
Enthusiastic crowds greeted the group, which paraded through the streets of Coyhaique before gathering outside the offices of the Regional government, located in front of the town’s central plaza. The leaders of the cavalcade, representatives of the region’s various municipalities, addressed their supporters there.
“We can live without hydro-electric power. We can live without gas. But we cannot live without water. God gave us these rivers, and we the right to defend them,” asserted Ernesto Sandoval, a leader of the cavalcade from the Baker River area.
Representatives of the cavalcade proceeded to enter the government building to seek a response to their demands. Before departing on its journey, the group sent a letter to Regional Governor Viviana Betancourt urging her government to take action against Endesa and Colbún, the companies behind the Aysén dam project.
The protestors alleged the companies’ claims to water sources and private lands in the region, a legacy of the final days of the Pinochet dictatorship, are illegitimate. The letter also called for a formal and ongoing dialogue between the government and the local community, and encouraged the government to take steps to promote the region’s traditional economic activities.
In their meeting Tuesday the cavalcade leaders presented the governor with a small solar panel and two renewable light bulbs – symbols of the alternatives to the massive hydro-electric facility.
Betancourt appeared briefly to address the crowd before returning to her meeting with the cavalcade’s leaders. “I, too, am on the side of democracy,” she said, pledging the voice of the local community would be heard throughout the process of examining the dam project proposal.
--------------------
There is also a cultural dynamic at play in the campaign against the project. Local communities fear that a massive influx of workers – from throughout Chile and the world – would disrupt the social fabric of the region and destroy its traditional way of life. The name chosen for the coalition of NGO’s, local organizations, and environmental activists behind the protest - “The Defense of the Spirit of Patagonia” - reveals much about the nature of the resistance to the project.
On the other side of the equation lies the question of how to meet Chile’s burgeoning energy demands. The country’s energy needs are expected to increase by seven percent in the coming year, and recent economic forecasts warn that rising prices in the energy sector could severely impact the country’s economic growth in 2008. The HydroAysén project would generate over 2,700 MW of electricity – nearly a quarter of the country’s current annual consumption.
While the national government is now taking steps to increase investment in alternative energy sources, supporters of HydroAysén – and there are many, even here in Coyhaique – stress that these options cannot provide an immediate solution to Chile’s looming energy crisis.
“In the next 10 years Chile will have to double its energy capacity,” Bernardo Matte, the head of Colbún, one of the companies behind HydroAysén, recently told Qué Pasa magazine. “The development of alternative renewable energies is certainly an important part of our strategy for the future, but we have to live in the real world.” (The reason environmentalists want to save it.)
Ultimately, the national government has control over the most contentious issues, including the question of water rights, which fall under national law. The regional authority is appointed by the President, and therefore has little lee-way to pursue its own course of action. Its policy has been to remain neutral, pending the results of the Study of Environmental Impact for the project, which the companies hope to submit to COREMA, the regional environmental authority, in January.
“We will continue to listen to both sides of the debate, but we cannot judge something that is still a potentiality, with so many uncertainties,” said Jorge Díaz, the chief advisor to the regional governor.
He assured that the government is working on projects to foment the local economy and develop alternative energy sources and will continue to do so regardless of the ultimate fate of HydroAysén.
Faced with these realities, there is a sense of fatalism surrounding the campaign against HydroAysén. Jorge Figueroa, a native of Cochrane, has spent his whole life in the region and now lives in the capital. He came to greet the cavalcade, which included his 70-year old father, with his young sons.
He lamented how his home town has already changed dramatically in the ten years since moved to Coyhaique. He believes the construction of the dams would destroy one of the most unique areas on earth but also believes the government is inclined to see the plan through – and there is little that can be done to stop it.
“The mentality in this country is the following,” he said. “If people see money, if they see power, they will immediately sell everything.”
Here is the full article.
Thursday, November 29, 2007
Chile's anti-dam horseback protestors arrive in Coyhaique
Posted by
Patagonia Under Siege Editor 1
at
1:02 AM
Labels: Aysen Project, Baker, Colbun, Defensa Patagonia, Endesa, HidroAysen, Matte, Pascua
Thursday, November 8, 2007
Rio Puelo dam, one of twenty-two planned for Southern Chile - Argentina fights back
Dams spark resistance on both sides of the border
Hydroelectric plants would damage natural water flows in pristine south.
Llanada Grande is located in a bucolic spot deep in the Chilean south, near Cochamó, 200 kilometers south of Puerto Montt, and 1,200 kilometers south of Santiago.
This small village, like others in the foothills of the Andes, has a historical relationship with Argentina across the border for family and economic relations.
Now, communities on both sides of the border are standing up to the El Portón hydroelectric plant planned on the Puelo River.
These lands at the 42nd parallel have a microclimate that allows crops to grow — conditions that are not found wholly adverse in other parts of the southern Region X — such as fine fruit, as well as and beekeeping.
The pristine rivers, lakes and forests here have also turned the area into a major tourist destination.
As of now, the residents of the Puelo River basin have received no information from the company heading the project, Endesa Chile — an affiliate of the Spanish company of the same name — and only have figures from a study conducted by the nongovernmental organization Geoaustral of Puerto Montt.
According to the report, the dam’s construction would flood 5,000 hectares and displace at least 80 families.
Organized resistance
In February, the residents here began to meet and in September formed the Citizens’ Committee of the Puelo Basin.
They say that the dam would change the climate and contaminate the waters with the putrefaction of the eventually submerged forest and the new river flow, which will be regulated by the company’s energy needs.
This will affect the entire water system of the area, which begins in the El Bolsón village and Los Alerces National Park, in Argentina, up to Chile’s Reloncaví estuary.
“The lake that is going to form with the dam is going to affect the entire Puelo River and can also affect the Puelo Lake,” which is located in Argentina, said Kent Schoenawer, a tour operator from Argentina.
“When there are very big surges, which occur every 4 to 5 years, the lake will rise up to 7 meters, it will merge with the Puelo Lake and the Inferior Lake [in Chile] and the Puelo River.
We’re talking about a lot of water. If there is a dyke, I don’t know if it could let the water through fast enough and even if it does, there could also be problems on the other side of the dyke.”
“When they have to open the doors there are big floods. Last year in the town of Hualqui [in the VIII Region] there was a flood that covered more than 2,000 houses, something that has never happened before.
In the summer, the Bio Bio River [where the Endesa-constructed Pangue and Ralco hydroelectric plants are located] there’s almost no water, they’re pure beaches, the river’s entire life was lost and that’s what’s going to happen with the Puelo,” warned Pedro Soto Oyarzo, president of the Neighborhood Organization of the Puelo River, a neighboring village of Llanada Grande.
“The Puelo feeds the Reloncaví estuary, it brings oxygen to the sea water and takes out a little of its salinity. That’s how the companies that are there with their salmon and mussel crops can survive.
Once this oxygen is stopped, the estuary’s life ends. So, it’s a rather serious problem. It will cause unemployment in addition,” said Marcial Aguirre, a resident in nearby Puerto Varas.
But some farmers impoverished because of low production believe that this project will change their fate, not because it will directly improve the economy, but because it will allow them to look for work in other sectors.
“If they build the dam and they pay me well, I have no problem in selling. I was born here and I was brought up working brutally.
This winter, 32 sheep died on me and there is no money coming in. What you plant here, that’s what you live on.
There’s some seasonal work, but it’s not enough to live on more or less,” said Toribio Ortega, whose property is near the proposed dam site.
Energy crisis
“We have an urgent need as a country, which is to ensure an electricity supply, and in this sense, what we’re doing is advancing the proceedings, not only environmental ones but also in other areas,” said Minister of Energy and Mines Karen Poniachik, to the Santiago Diario Financiero in September 2006. She added that the government would not lower environmental requirements, however.
The sector most endangered by the crisis is mining, according to the National Statistics Institute, which says that it consumes 40 percent of the country’s electricity.
The state-run National Copper Corporation, CODELCO — a pillar of public financing — uses approximately 15 percent of the country’s electricity and predicts it will double that in 9 years. Hydroelectric plants generate about 70 percent of the national energy supply.
El Portón, which would generate 320 megawatts, is only one of seven plants that Endesa Chile would build in the southern part of the country, four of them in partnership with the local company Matte.
According to the Jóvenes Tehuelches group of the Chilean town of Aysén, a total of 22 dams are currently being proposed in the southern region by different companies.
Mapuche and campesino communities, as well as protected natural areas, will be affected by flooding or electricity grids. These natural areas cross over into Argentine territory, and comprise the greatest cold-weather biodiversity in the world.
The Mapuche say that the dams do not only end with the newen, or force in Mapuche, of the rivers and lakes, but also of plants and animals as the equilibrium between different elements of nature, among them man, or che, will be broken.
According to the country’s Water Code, which was written in 1981 during the dictatorship of Augusto Pinochet (1973-90), the state could cede “rights to water usage” to private companies, which that way acquire wide powers to exploit the economic potential of Chile’s rivers and lakes.
Endesa Chile has rights to approximately 80 percent of the country’s waters and controls 13 hydroelectric plants.
Here is the full article.
Friday, November 2, 2007
Mining Giants Account For Fifty Percent Of All Corporate Profits in Chile
CHILE’S BUSINESSES SHOW STRONG RESULTS THROUGH 3rd QUARTERMining Giants Account For 50 Percent Of All Corporate Profits
(Nov. 2, 2007) Chilean enterprises have done well this year, showing an overall 12 percent increase in profits from January through September, as compared to 2006. Big winners are the mining and forestry companies.
Profits at all businesses are up by US$22 billion compared to September, 2006, according to figures by Chile’s Securities and Exchange Regulator (SVS). Total sales add up to 164 billion, a 14.9 percent increase compared to same period last year.
The two largest mining companies, state-owned CODELCO and BHP Billiton’s Escondida, accounted for 50 percent of total profits in Chile. CODELCO registered overall profits of US$6.7 billion in the first nine months of the year, while Escondida saw its profits grow to US$ 5.3 billion in the same period. But while Escondida’s profits are up by 28.3 percent compared to last year, CODELCO saw its profits diminish for the first time in five years, down by 7 percent. The state-owned mining company has seen its production costs rise considerably, affecting overall profits.
Of the country’s economic groups, the two largest, the Matte and Angelini consortiums, have profited the most this year. Cellulose-company CMPC - part of the Matte group - has seen its overall profit for the first nine months this year add up to US$377 million - an impressive 128.3 percent increase compared to the firsty nine months of 2006. Angelini’s CELCO showed an overall profit of US$534 million, a 25 percent increase compared to September last year. The positive numbers are attributed mostly to record prices for cellulose and a sharp increase in production capacity.
Here is the full article.
Saturday, October 13, 2007
ForestEthics Challenges Chile's Matte and Angelini Economic Groups
Opponents of a plan to build five large hydroelectric dams in Region XI are welcoming a new partner in their campaign to protect Chile’s majestic, glacier-fed rivers in the southern Chile area known as Aysén.
This week, an influential U.S. environmental group called ForestEthics joined the fray with a stern warning to two of Chile’s largest economic groups: the Matte and Angelini consortiums. The Matte Group is a majority owner of Colbún, a Chilean energy company that, together with Spanish electricity giant Endesa, is planning to build five dams in Region XI – three on the Pascua River and two on the Baker River. The Angelini group has a minority share in Colbún.
“We insist that the Matte Group and the Angelini Group withdraw from the HidroAysén Project if they want to continue working with ForestEthics and its Chilean allies,” said Aaron Sanger, Forest Ethics’ former Chile program director.
Sanger recently agreed to work with U.S. and Chilean NGOs to lead an international campaign against the Aysén Dam projects. Given Sanger’s track record at Forest Ethics in fighting corporate abuse of Chile’s native forests, dam opponents have gained an important new ally.
ForestEthics is a San Francisco-based organization that works to protect endangered forests by drawing negative attention to companies profiting from their destruction. Several years ago those efforts brought ForestEthics in direct conflict with the Matte and Angelini Groups, both major players in Chile’s lucrative forestry and paper pulp industry.
ForestEthics and other Chilean and international NGOs mounted a serious consumer awareness campaign in 2002 that threatened Chilean wood product sales in the United States. The campaign climaxed with the publication of a full page ad in the New York Times lambasting the devastation of Chile’s native forests by Chile’s forestry industry (ST, April 5, 2004). A year later, the Matte and Angelini Groups, together with U.S. Company Home Depot, signed an agreement with ForestEthics committing themselves to protecting engendered Chilean forests.
The highly controversial HidroAysén Project, however, jeopardizes that agreement, ForestEthics warned this week. “ForestEthics believes that this (dam) project will destroy Chilean native forests, thousands of hectares of Chilean native forest, and ForestEthics has invested more than eight years in working to protect those forests. If Angelini and Matte are serious about their commitments to protect those same forests, they will withdraw from this project,” Sanger told the Santiago Time’s sister newspaper, the Patagonia Times.
Here is the full article.
Posted by
Patagonia Under Siege Editor 1
at
8:11 PM
Labels: Angelini, Baker, Colbun, Dams, Endesa, Environmental NGOs, ForestEthics, HidroAysen, Matte
